06 / Business / Product development & PLM

Odoo PLM.
A better idea.
Built in.

Turn product changes into controlled releases. Keep engineering decisions, bills of materials and production instructions connected from prototype to the next build.

Product development & PLM on the business terraces, connected to the application and platform layers.
01 / BusinessPeople & processes
02 / ApplicationOdoo & integrations
03 / PlatformReliable operations

Business first

A new revision must reach the factory, not just a folder.

A drawing can be correct while production still uses yesterday’s components. Product development needs an agreed handover between design, purchasing, quality and manufacturing. Everyone should know what changed, why it changed and which revision is ready to use.

01

The drawing changed. The BoM did not.

Keep the engineering change and the manufacturing definition together so a revision does not depend on someone copying a spreadsheet.

02

Two teams edit the same product.

Give concurrent changes a review path and check their combined effect before release.

03

Approved in a meeting. Unclear on the floor.

Connect the decision to the released instructions and explain what happens to work already in progress.

The business flow

Four steps.
One connected process.

Follow the business decision, then see where it lives in Odoo. Select a step to explore it.

01 / Propose

Give the change a reason.

An improvement may start with a customer request, a supplier substitution or a quality issue. Capture the reason and the product affected.

In Odoo

Engineering Change Orders in Odoo PLM organise changes to products and bills of materials through defined stages.

  • Odoo PLM
  • Engineering Change Orders

What Odexer brings

We map change categories, responsibilities and links to quality or commercial requests so proposals arrive with usable context.

02 / Revise

Work on the next version safely.

Engineering needs room to test a different component or operation while production continues with the released definition.

In Odoo

PLM revisions allow changes to a test BoM before applying them to the production BoM; design files can accompany the change.

  • Odoo PLM
  • Bills of Materials

What Odexer brings

We structure product variants, documents and revision conventions, and assess any CAD or document-system integration separately.

03 / Review

Bring the right disciplines into the decision.

A technically sound revision can still affect stock, tooling, cost and inspection. Review those consequences before committing to a release.

In Odoo

ECO stages can have required approvers. The approval configuration determines whether applying a change is blocked pending acceptance.

  • PLM approvals
  • Odoo Quality

What Odexer brings

We agree approval authority, evidence and exceptions, then test that required decisions cannot be skipped through another route.

04 / Release

Make the approved version usable.

Production needs the new instructions and a clear rule for the work already started. A release is an operational handover.

In Odoo

Applying an approved ECO updates the production BoM and retains version history. Existing manufacturing work needs an explicit transition policy.

  • Odoo Manufacturing
  • Revision history

What Odexer brings

We plan effective dates, stock disposition and work-in-progress handling, with a rehearsal using representative products.

Feature availability depends on your Odoo version, edition, installed apps and configuration. We confirm the fit, required integrations and any localisation needs before committing the implementation scope.

Business first. Code second.

What better looks like.

A practical direction for the implementation, agreed against your real process.

02 / Application

A usable production handover.

Operators receive the documents and component definition they need.

Integrations ↗

03 / Platform

Fewer hidden dependencies.

CAD, supplier data and manufacturing records have agreed owners.

Platform operations ↗

Questions, answered.

Before you change
the way you work.

Start with your process.
We will work through the details.

Does PLM replace our CAD software?

No. PLM manages the product-change process and related manufacturing definitions. We assess the interface to your CAD or document system and define which system owns each file and attribute.

Can we require approval before a change is applied?

Yes, PLM supports required approvers at ECO stages. The distinction between required and optional approval matters; we test the policy against your actual roles.

What happens to orders already in production?

That must be designed deliberately. We agree whether existing work finishes on its original revision, is reworked or changes under a controlled exception.

Can we bring historical revisions across?

We assess the source history and the value of migrating it. Some records may belong in the operational system and others in a searchable archive with reliable links.

Part of the whole

Let’s start with the business.

Where does your
process get stuck?

Tell us what happens today - and what needs to work better.

Talk to an engineer ↗