The drawing changed. The BoM did not.
Keep the engineering change and the manufacturing definition together so a revision does not depend on someone copying a spreadsheet.
06 / Business / Product development & PLM
Turn product changes into controlled releases. Keep engineering decisions, bills of materials and production instructions connected from prototype to the next build.

Business first
A drawing can be correct while production still uses yesterday’s components. Product development needs an agreed handover between design, purchasing, quality and manufacturing. Everyone should know what changed, why it changed and which revision is ready to use.
Keep the engineering change and the manufacturing definition together so a revision does not depend on someone copying a spreadsheet.
Give concurrent changes a review path and check their combined effect before release.
Connect the decision to the released instructions and explain what happens to work already in progress.
The business flow
Follow the business decision, then see where it lives in Odoo. Select a step to explore it.
01 / Propose
An improvement may start with a customer request, a supplier substitution or a quality issue. Capture the reason and the product affected.
In Odoo
Engineering Change Orders in Odoo PLM organise changes to products and bills of materials through defined stages.
What Odexer brings
We map change categories, responsibilities and links to quality or commercial requests so proposals arrive with usable context.
02 / Revise
Engineering needs room to test a different component or operation while production continues with the released definition.
In Odoo
PLM revisions allow changes to a test BoM before applying them to the production BoM; design files can accompany the change.
What Odexer brings
We structure product variants, documents and revision conventions, and assess any CAD or document-system integration separately.
03 / Review
A technically sound revision can still affect stock, tooling, cost and inspection. Review those consequences before committing to a release.
In Odoo
ECO stages can have required approvers. The approval configuration determines whether applying a change is blocked pending acceptance.
What Odexer brings
We agree approval authority, evidence and exceptions, then test that required decisions cannot be skipped through another route.
04 / Release
Production needs the new instructions and a clear rule for the work already started. A release is an operational handover.
In Odoo
Applying an approved ECO updates the production BoM and retains version history. Existing manufacturing work needs an explicit transition policy.
What Odexer brings
We plan effective dates, stock disposition and work-in-progress handling, with a rehearsal using representative products.
Feature availability depends on your Odoo version, edition, installed apps and configuration. We confirm the fit, required integrations and any localisation needs before committing the implementation scope.
Business first. Code second.
A practical direction for the implementation, agreed against your real process.
01 / Business
The reason, review and released definition remain connected.
Implementation & development ↗02 / Application
Operators receive the documents and component definition they need.
Integrations ↗03 / Platform
CAD, supplier data and manufacturing records have agreed owners.
Platform operations ↗Questions, answered.
Start with your process.
We will work through the details.
No. PLM manages the product-change process and related manufacturing definitions. We assess the interface to your CAD or document system and define which system owns each file and attribute.
Yes, PLM supports required approvers at ECO stages. The distinction between required and optional approval matters; we test the policy against your actual roles.
That must be designed deliberately. We agree whether existing work finishes on its original revision, is reworked or changes under a controlled exception.
We assess the source history and the value of migrating it. Some records may belong in the operational system and others in a searchable archive with reliable links.
Part of the whole
Let’s start with the business.
Tell us what happens today - and what needs to work better.